Harvest Monday. Day 8 is the target, Day 12 is the outer bound. 周一采收。第8天为目标,第12天为最终期限。
Day 8 is the target, not the deadline. Consistency is worth real money downstream — the trim room, Rob's machine schedule, and the aunties all plan around a Monday handoff. 第8天是目标,不是死线。一致性在下游意味着实实在在的效益——修剪房、Rob 的机器排期以及阿姨们都围绕周一交接安排工作。
Day 12 is the outer bound. Some batches will not be ready on Day 8, and forcing them down wet is worse than extending. Drying rate is the water load in the room against the capacity to remove it, and both vary: plant count, wet weight, leaf load, whether the room was wet-trimmed, how many dehumidifiers are running, whether AC control is holding. Day 12 is not a forced takedown — it is where the call stops being the technician's and becomes a documented decision by the Lead and the Supervisor. 第12天是最终期限。有些批次到第8天不会达标,湿着强行下架比延长更糟。干燥速度取决于房间内的水分负荷与除湿能力之比,两者都会变化:株数、湿重、叶量、是否湿修、除湿机运行台数、空调控制是否稳定。第12天并非强制下架——而是该判断不再由技术员决定,转为由主管与上级主管共同作出并记录在案的决策。
The outer bound landing on Friday is convenient: a Day 12 takedown means bucking Friday, cure across the weekend, machine trim Monday. The cure absorbs the weekend either way. 最终期限落在周五很合适:第12天下架意味着周五摘花、周末熟化、周一机器修剪。无论哪条路径,熟化都能吸收周末时间。
Recorded before or as the room is loaded. This is what sets the expected track. 在装载房间之前或期间记录。这决定了预期路径。
| Track路径 | Indicators判定依据 | Expected takedown预期下架 |
|---|---|---|
| Standard标准 | Typical poundage for the room, dehumidification at full complement, AC holding, normal hang density该房间常规重量,除湿机满配运行,空调稳定,挂晾密度正常 | Day 8 (Mon)第8天(周一) |
| Heavy重载 | High poundage, heavy leaf load, a dehumidifier down, marginal AC control, or a fully packed room重量偏高、叶量大、有除湿机故障、空调控制偏弱,或房间完全塞满 | Day 9–11, possibly Day 12第9–11天,可能到第12天 |
| Phase阶段 | Days天数 | Temp温度 | RH湿度 | Dehus除湿机 | Air exchange换气 | Lights灯光 |
|---|---|---|---|---|---|---|
| 1 — Initial drying1 — 初始干燥 | 1–3 · Mon–Wed1–3 · 周一至周三 | 63°F | 20% | 20% | Intake + exhaust, continuous进气与排气,持续运行 | Off关闭 |
| 2 — Controlled drying2 — 控制干燥 | 4–7 · Thu–Sun4–7 · 周四至周日 | 65°F | 45% | 45% | 24 hours a day全天24小时 | Off关闭 |
| 3 — Hold & takedown3 — 保持与下架 | 8 · Mon8 · 周一 | 70°F | 55% | 55% | 24 hours a day全天24小时 | Off关闭 |
| E — ExtensionE — 延长干燥 | 9–12 · Tue–Fri9–12 · 周二至周五 | 65°F | 45% | 45% | 24 hours a day全天24小时 | Off关闭 |
The last day a change can meaningfully move the Day 8 result. It does not get skipped, and the Lead is notified either way — including when no action was needed. 最后一个能实质影响第8天结果的调整日。不得跳过,且无论结果如何都须通知主管——包括无需行动的情况。
| Finding判定 | Reading读数 | Action措施 |
|---|---|---|
| Ahead of pace进度偏快 | Weight loss over 75%, or buds at or below 12% MC失重超过 75%,或花已达到或低于 12% 含水率 | Raise RH toward 55% early to slow the dry. Notify the Lead.提前将湿度上调至 55% 以减缓干燥。通知主管。 |
| On pace进度正常 | Weight loss around 55–70%, buds still above 14% MC失重约 55–70%,花仍高于 14% 含水率 | Hold Phase 2 setpoints. Record and notify.维持第2阶段设定值。记录并通知。 |
| Behind pace进度偏慢 | Weight loss under 50%, or buds above 18% MC失重低于 50%,或花高于 18% 含水率 | Drop RH 5–10% for Days 6–7. Notify the Lead. Flag the batch as likely to extend and tell the trim room.第6–7天将湿度下调 5–10%。通知主管。标记该批次可能延长并告知修剪房。 |
Run a short read — one tagged-branch weight and one meter sample. This decides what the room does overnight. 进行一次简短读数——一根标记枝称重加一次水分仪取样。这决定房间当晚的运行状态。
Weight loss 70%+, buds approaching 12–13%. Set Phase 3 (70°F / 55%) Sunday evening so the room is stable Monday morning.失重 70% 以上,花接近 12–13%。周日傍晚设定第3阶段(70°F / 55%),确保周一早晨房间稳定。
Weight loss under 65%, buds above 14%. Hold Phase 2 conditions — do not set Phase 3. Notify the Lead and the trim room that Monday takedown is at risk.失重低于 65%,花高于 14%。维持第2阶段条件——不要设定第3阶段。通知主管与修剪房,周一下架存在风险。
All three checks are taken and recorded. From Day 8 on, this gate runs daily until the batch passes, or reaches Day 12 and escalates. 三项检查全部执行并记录。自第8天起每日执行,直至批次通过,或到达第12天转为上报决策。
| Check检查项 | Criterion标准 | Note说明 |
|---|---|---|
| Snap test折断测试 | 60% or more of small lateral branches snap cleanly60% 或以上的细侧枝能干脆折断 | Pencil-thickness and under. Main stalks still bending is normal — do not wait on them or you will overdry the batch.铅笔粗细及以下。主茎仍能弯曲属正常——不要等待主茎,否则会造成整批过干。 |
| Moisture meter水分仪 | Buds average 11–12% MC · thin stems 10–12%花平均 11–12% 含水率 · 细茎 10–12% | Sample from at least four positions in the room, not one convenient rack.房间内至少取四个位置取样,不能只取一个方便的架位。 |
| Harvest day wet weight采收日湿重 | 75–80% loss from harvest day wet weight相对采收日湿重失重 75–80% | The only check that catches a batch whose stems snap while the interior is still wet.唯一能识别"茎已折断但内部仍湿"批次的检查项。 |
| Condition情况 | Response应对 |
|---|---|
| Checks pass检查通过 | Buck on schedule. Record readings on the batch record. Cure length judged normally by Rob.按计划摘花。将读数记入批次记录。熟化时长由 Rob 正常判断。 |
| Wet but workable偏湿但可处理 Stems snap, weight loss 65–75%, buds 12–14%茎能折断,失重 65–75%,花 12–14% |
Buck. Flag the lot for a full 3-day cure and note it on the batch record. Lids off the full 15–20 minutes every morning.摘花。标记该批次进行完整3天熟化,并记入批次记录。每天早晨完整开盖 15–20 分钟。 |
| Not ready, before Day 12未就绪,第12天之前 Weight loss under 65%, buds over 15%失重低于 65%,花高于 15% |
Do not buck. Extend one day with the Lead's authorization. Re-run the gate tomorrow.不要摘花。经主管授权延长一天。次日重新执行判定。 |
| Not ready, at Day 12未就绪,已到第12天 | Do not buck on the date alone. Run the full gate, escalate to the Lead and the Supervisor the same day, and record their decision with its cause. Take down: extended cure, verbal handoff, closing readings on the batch record. Keep hanging: twice-daily mold scouting, a stated re-check date, and the room conflict resolved before the next harvest is cut.不得仅因日期而摘花。执行完整判定,当天上报主管与上级主管,并记录其决定及原因。若决定下架:延长熟化、口头交接、将结束读数记入批次记录。若决定继续挂晾:每日两次霉菌巡查、明确的复检日期,并在下一批采收前解决房间占用冲突。 |
| Overdried过干 Buds under 10% MC, weight loss over 82%花低于 10% 含水率,失重超过 82% |
Buck on schedule and notify post-processing. The cure cannot put moisture back. Overdried flower sheds trichomes in machine trim and breaks up on the sifting tray — handling gets gentled downstream, and the cause gets investigated before the next cycle.按计划摘花并通知后处理环节。熟化无法补回水分。过干的花在机器修剪时会脱落腺毛,在筛盘上易碎——下游需减轻处理力度,并在下一周期前查明原因。 |
Every extension day: confirm the room is back at Phase 2 conditions, re-run the gate, and read the setpoint-versus-actual record. That record is the diagnosis. 每个延长日:确认房间已回到第2阶段条件,重新执行判定,并查看设定值与实际值的记录。该记录即为诊断依据。
| Pattern形态 | Diagnosis诊断 | Response应对 |
|---|---|---|
| Actual RH tracked setpoint all cycle整个周期实际湿度跟随设定值 | The load was simply large. The dry is working, it just needs time.纯粹是负荷偏大。干燥正常进行,只是需要时间。 | Continue the extension. Nothing to fix.继续延长。无需修正。 |
| Actual RH ran consistently above setpoint实际湿度持续高于设定值 | Dehumidification capacity is the constraint, not the setpoint. Turning the dial lower will do nothing — the room already cannot reach the number it has.瓶颈在除湿能力,不在设定值。把数值调低毫无作用——房间连现有目标都达不到。 | Add portable units, reduce fresh-air exchange rate, check for a failed or iced dehumidifier, verify AC is holding. Escalate the same day.增加移动除湿机、降低新风换气量、检查是否有除湿机故障或结冰、确认空调是否稳定。当天上报。 |
| RH tracked setpoint but temperature ran high湿度跟随设定值但温度偏高 | AC control is marginal. Warm air holds more water and the dehus fight it.空调控制偏弱。暖空气含水更多,除湿机需额外负担。 | Escalate. Note it for the load assessment on future cycles.上报。记录以供后续周期的装载量评估参考。 |
Checklist state resets on refresh. Record the day's readings on the paper log. 刷新页面后清单状态会重置。请将当日读数记入纸质日志。
Takedown feeds directly into Stage 1 of the Post-Processing SOP. 下架直接进入后处理 SOP 的第1阶段。
| Symptom现象 | Action措施 |
|---|---|
| Room will not hold RH房间无法维持湿度 | Check dehumidifier drains, filters, and door seal. If the fresh air intake is bringing in wet air, reduce the exchange rate and notify the Lead. Do not chase it with temperature.检查除湿机排水、滤网及门封。若新风进气带入湿空气,降低换气量并通知主管。不要用温度去补偿。 |
| Actual RH consistently above setpoint实际湿度持续高于设定值 | Capacity, not setpoint. Lowering the dial will not help. Add portables, cut exchange rate, check for an iced or failed unit, verify AC. This is the single most common cause of a batch needing extension.这是能力问题,不是设定值问题。调低数值无济于事。增加移动除湿机、降低换气量、检查是否结冰或故障、确认空调。这是批次需要延长的最常见原因。 |
| TrolMaster disagrees with the orange handheldTrolMaster 与橙色手持仪读数不符 | Recalibrate the sensor. Do not compensate by changing setpoints — you will be flying blind for the rest of the cycle.重新校准传感器。不要通过调整设定值来补偿——那样整个周期都将失去参照。 |
| Mold or botrytis found发现霉菌或灰霉病 | Remove and isolate immediately. Do not carry it through the room. Notify the Lead. Increase airflow; do not raise temperature.立即移除并隔离。不要携带其穿过房间。通知主管。加大气流;不要升高温度。 |
| Crispy exterior, soft interior外表干脆、内部柔软 | Case hardening — the dry is outrunning moisture migration. Raise RH immediately and reduce fan speed. Note it on the batch record and plan for a longer cure.表面硬化——干燥速度超过了水分迁移速度。立即提高湿度并降低风扇转速。记入批次记录并安排更长的熟化时间。 |
| Meter readings scattered widely across the room房间内水分仪读数差异很大 | An airflow or hang-density problem, not a meter problem. Reposition fans, open up crowded sections, note the affected positions.这是气流或挂晾密度问题,不是仪器问题。调整风扇位置,疏散拥挤区域,记录受影响位置。 |
| Tagged branches disagree by more than about 10%标记枝之间差异超过约 10% | The room is drying unevenly. Record which positions are fast and slow, and correct fan placement before the next cycle.房间干燥不均。记录哪些位置偏快、哪些偏慢,并在下一周期前调整风扇布置。 |
| Batch extends past Day 10 with no clear cause批次延长至第10天后仍无明确原因 | Pull the whole cycle's setpoint-versus-actual record before changing anything. The answer is almost always in that column.在做任何调整之前,先调出整个周期的设定值与实际值记录。答案几乎总在那一栏里。 |